Oversee the capital investments relating to the company's fixed assets with a cross-functional team of salaried and hourly stakeholders.
Propose and implement work processes, procedures in compliance with Engineering Excellence master document.
Coordinate and manage resources, both personnel (e.g. technicians, contractors etc.) and funding, to ensure the project or mission fulfills and meets the set objectives defined within the approved scope.
Propose and control the project costs in accordance with the Capital Investment Guidelines.
Ensure that all projects are properly managed according to best practices and guidelines.
Propose and monitor the project in accordance with the key performance indicators.
Demonstrate and encourage the integration of the corporate values into the project culture. Functional Responsibilities:
Exhibit and implement an attitude of zero tolerance for unsafe situations and never implement any change, whether directly instructed to, or under your own initiative, without first questioning its impact in relation to product safety/quality, people safety, and the environment.
Ensure that the highest principles of ethical conduct on behalf of the community, consumer, company, and the engineering profession are adhered to and that all dealings are maintained within a competitive and fair environment and above reproach.
Support and encourage clear and open communication between the team members and related stakeholders, e.g. site, division, and market management, project steering committee, Zone Technical, PTC, CO- Engineering, CT-Packaging, and the SBU.
Encourage all team members to direct their efforts towards a "low cost, highly efficient" operation which meets the business needs.
Take the lead in driving Good Hygienic Engineering in the design and execution of the project, and ensure the implementation meets Good Manufacturing Practices (GMP) and safety standards.
Ensure that engineering is respecting the
Encourage continuous improvement, networking, and sharing information within engineering such that it becomes a key pillar of the engineering culture.
Ensure that the procedures for protecting technological and proprietary know-how are in place, are rigorously managed, and respected. Ensure that the
Ensure that all projects are sustainable and designed for the long term, resulting in a positive impact on the company ROIC.
Prepare the project for approval in accordance with the Guidelines for Capital Investment. Specific
Ensure that all assets are well designed (i.e. plant layout, equipment selection, etc.) and fit the business purpose through applying new technologies, proven principles, thorough design reviews, and basic science.
Support or manage all official Value Engineering Analysis (VEA) studies, and a VEA approach is taken to challenge the design in order to find optimal solutions.
Ensure that the design is directed towards a low cost, highly efficient, and flexible operation keeping total cost of operation in mind when selecting equipment and suppliers, while at the same time looking for the latest in proven technology to advance the company's competitive advantage.
Check the validity of all mandatory safety, environment, energy, line efficiency, and performance reports in respect to engineering.
Ensure the correct Subject Matter Experts are involved in all 30%, 60%, 90% design reviews. Specific
Ensure safe work sites at all times and installations that are easy to operate, clean, and maintain as well as guaranteeing after commissioning the safe, consistent manufacture/distribution of quality products.
Ensure that when working with external engineering services, contractors, suppliers etc. that the scope, deliverables, performance, and milestones are clearly detailed and agreed up front.
Ensure that a progress report is prepared for all projects on a monthly basis to include updated EST Estimate To Complete status.
Ensure compliance with business principles especially when dealing with procuring equipment, services, and management of the ongoing contracts. Specific
Ensure that the project scope is achieved within the agreed cost and timing.
Ensure that the operators, mechanics, electricians, etc. are effectively trained and that the transfer of the equipment to the client is both smooth and efficient.
Support the operation of the process or plant until required deliverables are achieved.
Manage the allocation of all expenditures to clearly defined assets and the entry into the assets register.
Complete the project file and ensure that it is handed over to the client. Ensure spare parts are properly set up by factory and PM’s are implemented for all new/modified equipment.
Complete a final report on all projects and ensure that this is circulated to the key stakeholders.
This includes all the supporting documentation from the OSL team that will be required by the Factory to operate and maintain the plant (e.g. operating instructions, equipment manuals, plant layouts, maintenance instructions, spare parts listing, etc.)
Degree/Diploma in Engineering Field. (Mechanical Engineering, Process Engineering, Chemical Engineering, Electrical Engineering).
Relocation required to factory site of projects. Some travel may be required for different projects for Factory acceptance and equipment selection. What You Bring:
experience within the food and dairy, cosmetic, pharmaceutical, or consumer products industry is a plus. Supervisory
experience in managing internal and external project team members or equivalent. Strong
In-depth knowledge of dry powder processing and packaging plants and technologies, or similar industries
Knowledge of regulatory
Understanding of financial analysis and relevant business drivers
MS Office, MS Project, MS Excel, Basic AutoCAD, Visio
Experience
Minimum 1-3+ years of significant
Benefits
experience in facilitating change in a manufacturing environment is critical. Bonus Points:
2-5% when relocated to actual project site Compensation & Benefits: